Setting up the Anvil OpenARM
Get your OpenARM up and running
Mechanical Set Up
Unboxing
When you first open up the box, your arms should look something like this:

Attaching pedestal to base
Secure the base plate to a flat surface, and then attach the included pedestal to the base plate, using the eight included M6x12 screws.

Attaching grippers
Mechanical
Use the included M3x6 screws (three per wrist) to attach the gripper to the wrist attachment point.

Electrical
Plug the gripper motor into the last motor on the arm as shown:

Connecting cameras
The camera module comes with two M3x6 screws attached. Use them to fasten the camera module to the camera mount on the robot, which is already in place. Then plug in the already-attached screw-lock cable, and tighten. Take care not to over-tighten these screws as it may damage the camera.

If you are not an Anvil Devbox customer, congratulations, your OpenARM setup is complete! If you are a DevBox customer, please continue to the cable set up below.
DevBox 2.0 Cable Set Up

The Devbox 2.0, when paired with OpenARM and OpenYAM robots shipped after August 26th 2026, will automatically detect left vs right arm and leader vs follower so robot cables can be plugged into any of the Robot CAN ports highlighted in orange.
If you are using the Devbox 2.0 with an OpenARM 1.0 or OpenARM 2.0 shipped before August 26th 2026, the Devbox will not automatically detect left versus right arm. Please plug in the CAN ports as specified below
For legacy DevBox 1.0 customers, refer to the DevBox 1.0 cabling for setup.
Finally, plug in the usb plug adaptor for the provided keyboard into any available usb slot.
Power
Make sure both Devbox power cables are plugged into a wall socket. Note that the robot and dev computer are powered separately. You will need to turn on the robot with the large red power switch at the back of the box AND turn on the computer with the power switch on the front of the box.
Tool / Equipment reference
To avoid any guess-work, we include here some examples of equipment that work well for various small setup / tuning steps that may be necessary either now or in the future (clamping, screw-tightening, etc). These will make it even easier to setup and work with your OpenARM:
Next Steps
Your OpenARM is now assembled and connected. Continue with Starting Robot Operation.
Last updated



